Other · Local MCP server
Microsoft Project
Audit, reschedule and author Microsoft Project schedules. No Java, no Project install.
What the MCP Registry states
The entry as published to the official MCP Registry (read 2026-10-04), latest version.
- Registry name
io.github.HorizunGroup/horizun-msproject-mcp- Version
- 1.6.0
- Status
- Active
- Category
- other
- Transport
- stdio (local process)
- Package
- NuGet
- Published
- 2026-10-02
- Updated
- 2026-10-02
- Publisher
- HorizunGroup (GitHub) · 4 servers with pages here
- Namespace
- Namespace verified by the MCP Registry via GitHub (github.com/HorizunGroup) · how
- Website
- github.com/HorizunGroup/horizun-msproject-mcp#readme
- Repository
- github.com/HorizunGroup/horizun-msproject-mcp
- Source
- Registry API entry
Packages
| Registry | Package | Version | Transport |
|---|---|---|---|
| NuGet | HorizunMsProjectMcp | 1.6.0 | stdio |
How to connect Microsoft Project
Microsoft Project runs locally from a .NET package published to NuGet: HorizunMsProjectMcp version 1.6.0. It speaks MCP over stdio, so the client starts it as a program and talks to it through standard input and output. It needs the .NET SDK; run as a .NET tool.
Derived from the registry entry, not tested here. What the server does, and on what terms, is set by its publisher; check its repository or website before giving it access to your accounts or files. How to add an MCP server to an assistant · Before you connect
More from HorizunGroup (GitHub)
| Server | Runs |
|---|---|
| Horizun PBI MCPBuild, audit and repair Power BI Desktop models and PBIP reports with DAX, TMDL and PBIR. | Local · stdio |
| Horizun Revit MCPLocal Windows MCP for Revit 2023-2027. Run the Windows installer before connecting a client. | Local · stdio |
| NavisCoordAutodesk Navisworks coordination: clash triage, root causes, work plans and reports. | Local · stdio |
More other servers
| Server | Runs |
|---|---|
| Microsoft Advertising MCP ServerMicrosoft Ads management - CRUD, Google Ads import, ad extensions, and async reports. | Remote & Local · HTTP, stdio |
| Microsoft Entra SCIMMicrosoft Entra SCIM 2.0 Provisioning API: user and group lifecycle, with a local mock. | Local · stdio |
| Microsoft ExchangeHosted multi-user MCP for Microsoft Exchange - on-premises, hybrid and Online, per-user rights. | Remote · HTTPLive check: sign-in required |
| Microsoft Graph MCPThe maintained single-binary successor to the retiring mgc - every MSP-relevant Microsoft Graph. | Local · stdio |
| Mid Continental MCPPublic catalog, company & B2B distribution info for Mid-Continental Dental Supply (Renew line). | Remote · HTTPLive check: ✓ handshake |
| Mif ToolsConvert, validate, and inspect AI agent memories across formats. | Local · stdio |
| Mifactory Logic VerifierVerify AI agent reasoning and logic for errors and contradictions. Pay-per-use. | Local · HTTP |
| Mifactory Spec ApiConvert docs to agent-readable specs with criteria and constraints. $0.10/convert. | Remote · HTTPLive check: ✓ handshake |